Wind Energy in Antwerpen

Årsutbyte

18 605

kWh/Jahr

Återbetalningstid

7

Jahre

CO₂-besparingar

2.7

t CO₂/Jahr

Example: 5 kWp system, country average values

Vanliga frågor om Antwerpen

How much electricity does a 10 kW wind turbine produce in Antwerpen?

With a capacity factor of 21%, a 10 kW turbine in Antwerpen generates approximately 18605 kWh per year.

How much does a small wind turbine cost in Antwerpen?

A 10 kW wind turbine in Antwerpen typically costs around €17,250 including installation.

What is the payback period for a wind turbine in Antwerpen?

Given local wind conditions, the payback period is approximately 7 years.

How much CO₂ does a wind turbine save in Antwerpen per year?

A 10 kW wind turbine in Antwerpen avoids approximately 2.7 tonnes of CO₂ per year.

Wie berechnen wir das?

Daten: Global Wind Atlas 3.3. Berechnungen sind Schätzwerte für eine Beispielanlage.

Vindpotential för Antwerpen

Check wind potential for Antwerpen