Wind Energy in Estugarda
Rendimento anual
11.746
kWh/Jahr
Período de amortização
12
Jahre
Economia de CO₂
4.5
t CO₂/Jahr
Example: 5 kWp system, country average values
Perguntas frequentes sobre Estugarda
How much electricity does a 10 kW wind turbine produce in Estugarda?
With a capacity factor of 13%, a 10 kW turbine in Estugarda generates approximately 11746 kWh per year.
How much does a small wind turbine cost in Estugarda?
A 10 kW wind turbine in Estugarda typically costs around €18,000 including installation.
What is the payback period for a wind turbine in Estugarda?
Given local wind conditions, the payback period is approximately 12 years.
How much CO₂ does a wind turbine save in Estugarda per year?
A 10 kW wind turbine in Estugarda avoids approximately 4.5 tonnes of CO₂ per year.
Wie berechnen wir das?
Daten: Global Wind Atlas 3.3. Berechnungen sind Schätzwerte für eine Beispielanlage.