Wind Energy in Atenas

Rendimento anual

12.164

kWh/Jahr

Período de amortização

12

Jahre

Economia de CO₂

5.4

t CO₂/Jahr

Example: 5 kWp system, country average values

Perguntas frequentes sobre Atenas

How much electricity does a 10 kW wind turbine produce in Atenas?

With a capacity factor of 14%, a 10 kW turbine in Atenas generates approximately 12164 kWh per year.

How much does a small wind turbine cost in Atenas?

A 10 kW wind turbine in Atenas typically costs around €15,000 including installation.

What is the payback period for a wind turbine in Atenas?

Given local wind conditions, the payback period is approximately 12 years.

How much CO₂ does a wind turbine save in Atenas per year?

A 10 kW wind turbine in Atenas avoids approximately 5.4 tonnes of CO₂ per year.

Wie berechnen wir das?

Daten: Global Wind Atlas 3.3. Berechnungen sind Schätzwerte für eine Beispielanlage.

Potencial eólico para Atenas

Check wind potential for Atenas